Dashboard card: Products
M
Maricar Infante
The objective is to easily track total quantities completed per day, providing visibility of production throughput and stage progress similar to the following:
- Quantities Recorded by Workflow Status
- Each time a job transitions from one status column to the next e.g. Unpack → Cut Down & Thickness → Taping Gluing (Note: not all status columns apply for all jobs), with the number of pieces completed being tallied.
- Product Type Breakdown
- Quantities should be grouped or visible by product category:
Engineered Timber
Laminate
Hybrid
LVT
- Daily Totals
- The system should calculate daily totals per workflow stage and per product type.
- Ideally, this can be viewed ideally at the top of each status column but also the dashboard.
Trigger Point
The quantity would be recorded when an item is transition out of a status column.